Field note

A look inside IHJO Limited's prototype tower combining kinetic façades, solar membranes, and prefabricated cores to deliver 30% faster builds with 42% lower energy demand.

Need the full playbook or BIM assets for this deployment? Reach out via the contact console and our engineering desk will send a tailored brief.